state enterprise gas turbine reserch & production complex
Main about enterprise product applications contacts news
news archiv archiv 2006
1-st quarter 2-nd quarter 3-rd quarter 4-th quarter
NEWS
Events of the 1st quarter 2006:
  • As the end of the 1st quarter of 2006

  •    UGT 15 000type gas turbine engine has accumulated total 2,120,000 operating hours,
       UGT 25 000type gas turbine engine has accumulated total 476,000 operating hours.
        Leading engine DN80 (UGT 25000) has accumulated 42,000 operating hours at the compressor station Sofievskaya (Ukrgasprom).
  • DG90 (UGT 15000) engines have been delivered to Russia, Ukraine and Belarus.
  • Development of technical documentation for UGT 45000 engine rated 45 MW has been completed … (in detail)
  • Five DG90 (UGT 15000) engines have been put into operation at Daryalyk compressor station in Turkmenistan.
  • Twenty DG90 engines have been put into operation in Russia … (in detail)
  • Maximum operating time of the leading UGT 6000 engine as a part of gas pumping unit at Dikanka compressor station (Ukraine) has exceeded 30000 hours of operation.
  • Scheduled inspection of four engines UGT 6000 has been performed at JSC ”Gasprom” power station in Zapolayrie (Northern Russia) … (in detail)
  • Engines DU80 (UGT 25000) have been put into operation in Iran … (in detail)
  • News | Exhibitions | Publications | Archives